Electrical · Santa Fe, NM

Electrical Repair Costs

Panel upgrades, GFCIs, wiring, and outlets. Estimates below are localized to labor and material rates in the Santa Fe, NM area (zip prefix 875). Enter your exact zip to refine.

Showing local estimates for Santa Fe, NM (87501)

Major$2,672 – $13,361

Knob-and-tube wiring present

Rewire affected circuits

Major$1,336 – $8,907

Aluminum wiring (branch circuits)

Pigtail connections or rewire

Major$1,357 – $3,619

Electrical panel outdated (fuse box)

Upgrade to modern breaker panel

Major$1,357 – $3,619

Electrical panel - Federal Pacific/Zinsco

Replace hazardous panel brand

Major$450 – $1,800

Service entrance cable damaged

Replace service entrance cable

Moderate$134 – $445

Extension cords used as permanent wiring

Install additional outlets/circuits

Moderate$133 – $443

Subpanel bonding/grounding issue

Correct grounding/bonding

Moderate$89 – $354

Electrical panel - double-tapped breakers

Add breakers or tandem breakers

Minor$45 – $273

Light fixtures not working

Repair/replace light fixtures

Moderate$89 – $223

No AFCI protection (bedrooms)

Install AFCI breakers (per circuit)

Moderate$66 – $222

Ungrounded 3-prong outlets

Install ground or GFCI protection

Major$66 – $177

No GFCI protection (kitchen/bath/exterior)

Install GFCI outlets (per location)

Moderate$44 – $177

Open junction boxes/exposed wiring

Cover junction boxes, secure wiring

Minor$67 – $178

Ceiling fan loose/wobbling

Secure ceiling fan to rated box

Moderate$44 – $132

Reversed polarity outlets

Correct wiring on outlets

Minor$14 – $45

Exterior outlets not weatherproof

Install weatherproof covers (in-use)

Major$23 – $46

Smoke detectors missing/expired

Install/replace smoke detectors

Minor$9 – $44

Electrical panel - missing knockouts

Install knockout fillers

Major$23 – $46

Carbon monoxide detectors missing

Install CO detectors

Minor$5 – $23

Missing outlet/switch cover plates

Install cover plates

About These Estimates

These estimates are based on national averages adjusted for local labor and material costs using BLS and BEA data. Actual costs vary based on specific conditions, contractor availability, and project complexity. Always obtain multiple quotes from licensed local contractors.